NeutralChris (Snyder Construction)Sep 15, 2026

Explained the 13-foot-deep excavation requires a shoring wall in the right-of-way and said the eight-month duration is driven by safely keeping pedestrians away from masonry work; agreed to explore phased options and wider access.